Completed work through email

Four packets, completed in the thread.

Quote coverage, change briefs, cited answers, and unsent RFI drafts. The Alder Ridge walkthrough below is an example. Live work uses your files. Replies include PDF/XLSX. Quantities stay PRELIMINARY until you confirm them.

Bring us one project

New message

Today

From

You

To

Subject

Same as writing a colleague. Address, subject, files, send. · paused

Bid and quote review

Match the drawing to the quote

A short reply plus the coverage register. Missing quote lines stay visible.

RTU-2 is on M-201. The quote has no matching line.

Re: Alder Ridge bid set

VGML to you

RTU-2 is on M-201 Rev 4. The vendor quote prices RTU-1 only.

RTU-2 has no matching quote line.

Coverage

  • RTU-1listed
  • RTU-2no matching line
  • EF-1listed

Alder_Ridge_Coverage.xlsxCoverage register

Revisions and change-order support

See what Rev 4 actually changed

A change brief comes back in thread. Unstated cost and schedule stay blank.

Controls moved to the GC. No cost figure is stated.

Rev 3 → Rev 4 change brief

VGML to you

What moved from Rev 3 to Rev 4?

What changed

Controls work moves to the GC.

Addendum 02 §3.4 assigns controls work to the GC.

Not stated

No cost or schedule figure is in the authorized set. Those lines stay blank.

Alder_Ridge_Revision_Brief.pdfCited brief

Cited project questions

Ask from the authorized file set

A question in. A one-line answer out, with the excerpt underneath.

Yes. Addendum 02 §3.4 assigns controls to the GC.

Re: Addendum 02 controls

VGML to you

Does Addendum 02 move controls to the GC?

Answer

Yes. Controls work is assigned to the GC. No cost figure is stated.

Addendum 02 §3.4: controls work is assigned to the GC.

Alder_Ridge_Marked_Plan.pdfSupporting excerpt

RFI and clarification drafts

Turn a gap into a send-ready question

The draft stays in thread for human review before it goes out.

Confirm whether RTU-2 belongs on the mechanical quote.

Draft RFI: RTU-2

Not sent

VGML to you

Please confirm whether RTU-2 is in the mechanical vendor scope, or should be added to the quote.

The draft stays in this thread until someone on the job sends it.

Alder_Ridge_RFI_Draft.pdfFor review